, which came into force on November 2, 2017. This guide ensured that every light switch and circuit breaker in the new hospital was priced fairly, from the simplest wiring to the most complex switchgear. The Legacy of 2017
The DSR documented the first significant push toward . For the first time, the review tracked:
Cement, steel, sand, crushed metal, brick, timber, and paints. pwd dsr 2017-18 maharashtra
: Often based on older benchmarks (e.g., 2007-08) but adjusted with current area-based percentages.
The DSR 2017-18 was not merely a reference document—it was an embedded in every stage of the procurement process. , which came into force on November 2, 2017
Beyond completed work items, the DSR 2017-18 also provided (per bag of cement, per metric ton of steel, per cubic meter of sand and aggregates) and labor rates (wages for masons, coolies, carpenters, bhistis, etc.). These basic rates were used in the rate analysis of complex work items.
: Includes road surveys, sub-grades, surfacing courses, and maintenance. For the first time, the review tracked: Cement,
| Aspect | Details | |--------|---------| | | District Schedule of Rates (DSR) for Public Works Department (PWD), Maharashtra | | Fiscal Year | 2017-18 | | Purpose | Standardized costing of materials, labor, and work items for government construction projects | | Budget Context | ₹7,000 crore allocated to PWD (up from ₹4,357 crore in 2016-17) | | Key Work Categories | Earthwork, concrete works, road works, masonry, finishing | | Sample Item | M-10 concrete for foundation and bedding (Item No. 02.26, Page No. 197) | | Access | Official PWD website, tender portals, civil engineering resources | | Related Exams | Maharashtra PWD JE Recruitment, Civil Engineering competitive exams |